Request call back

Temporary Pad Surface Installed for Iconic Sail GP Event

We were approached by one of our longstanding contacts within the events industry, to quote for the supply and installation of a 7500sqm temporary pad surface for the unloading of catamarans. 

View full story

Trackway supplied for crane support in Wirral.

Our customer is a mobile crane hire specialist, based in the North West who needed to place a crane on a road in Wirral. However, the space where the crane was required was split across two heights, making stability a challenge.

View full story

Ground protection for historic Harewood estate.

Our customer was organising an event on the grounds of Harewood House in Leeds and required an access road to allow vehicles and equipment on site for set up.

View full story

Trackway and generator supplied for remote mobile phone mast in Portsmouth.

Our customer required a temporary power generator to run a new phone mast in Portsmouth. But a sensitive site and very wet ground meant that vehicles could not access the site to install the generator.

View full story

Making a South East obstacle race more accessible.

Our customer is a leading international obstacle race company. When they needed trackway at short notice to set up their races in Kent (which included 12km and 5km courses), they came to us.

View full story

Clearing a dead tree from a country estate.

A large tree, that was a central piece on a country estate in Chipping Norton, died. A crane was needed to remove the tree, so Chris Notman came to us for a solution.

View full story

Keeping the world’s largest countryside show connected.

A mobile cell was required on the grounds of a stately home in Hertfordshire for an upcoming country pursuits and game fair.

View full story

Planning a wedding at Longleat Safari Park.

Wedding planner, Matthew Oliver needed a delivery road for a marquee, caterers and interior designers. It was absolutely vital that nothing disturbed the ground and ruined the picturesque location, so he came to us for help.

View full story

Helping a Wakefield primary school solve a last minute challenge.

Hendal Primary School were holding some large containers in their yard in Kettlethorpe, Wakefield. When these needed to be moved, they approached us to allow a Hiab lorry onto the site.

View full story

Removing a temporary classroom in Kent.

When Portable Building Sales needed crane access at a primary school in Swanley, Kent, they approached us for help.

View full story

Assisting in the move of an RAF aircraft.

A VC10 aircraft needed to be moved from one area of the RAF museum in Cosford to another. The nose of the aircraft alone weighted over 70t and it needed to be moved 150m away from its starting point.

View full story

Paving the way up a Welsh mountain.

We received a request from Bro Dyfi Community Renewables for a trackway install a mile up a mountainside in Machynlleth, Wales to allow access for a 90t crane to replace the gear box on a wind turbine.

View full story

Helping a utilities company work around the tide.

When a utilities company needed to carry out work on a beach in Scarborough, North Yorkshire, we were enlisted to work around the approaching tide and help their vehicles onto the sand.

View full story

Recovering trackway from a flood.

A telecoms customer had 224 trackway panels on long term hire at Hartland Point, Cornwall. When we arrived to collect the panels at the end of the job, the site was so severely flooded that our panels were nowhere to be seen.

View full story

Helping Bramham International Horse Trials run smoothly.

With fear of rain in the lead up to the Equi-Trek Bramham International Horse Trials, we were asked to help protect the ground around the members' area and stables.

View full story

Installing a new wind turbine in East Yorkshire.

A renewable energy company based in Driffield, East Yorkshire enlisted our help in reaching the site where they were to install a new wind turbine.

View full story

error: Content is protected !!