1
Site survey
- Walk the job and outline the task, getting to grips with why you need it and what will run on it.
- Assess any access issues and identify specific challenges such as slopes, gateways or overhead power lines.
- Measure up.
2
Detailed proposal
- Supply site plan with drawings of our recommended solution.
- Outline the approximate number of panels.
- Provide all necessary information such as risk assessments, method statements and crew certification.
- Provide quotation and installation date.
3
Installation
4
Collection
- Once you’ve confirmed that the track is ready for collection we issue an ‘off-hire’ number
- Confirm a collection date
- Send a crew to dismantle and collect the trackway
- Get your sign-off and hand over paperwork
5
Follow-up
- Call you for feedback.
- Ask you what we did well.
- Ask for suggestions as to how we can improve.
- Discuss any future access needs.