The Challenge
When a utilities company needed to carry out work on a beach in Scarborough, North Yorkshire, we were enlisted to work around the approaching tide and help their vehicles onto the sand.
The Solution
With the job being carried out in winter, we knew that we’d only have a short window of time before the tide would come in, so we had to act swiftly.
Our team made sure that as soon as the tide was out in the morning, they installed the 15 required panels quickly as possible. This guaranteed that as soon as our client arrived onsite, they would be able to get to work right away and avoid any delays.
Because the hire only lasted a day, our team remained onsite until all the work was complete and removed the trackway panels from the beach before the sea could bury them.